Petroleum Engineering

 

Petroleum Engineering
Contact

18th floor,Building A,North Star Huibin Plaza,No.8 Beichen East Road,Chaoyang Dist.,Beijing 100101,China.

024-23609806 024-23609560

FAX:010-84976930

Process features
2020-10-20
详细介绍
Agent injection equipment is diverse and versatile, it can be used for injection bubble discharge agent, methanol and corrosion inhibitor.
Injecting foam discharge agent by injection pump, it is easy to measure, adjust and continuous filling. when constrained by external conditions, it also can achieve cyclical filling.
Technology services of gas lift dewatering with truck-mounted natural gas compressor
The process of single gas well resumption production by gas lift dewatering with truck-mounted natural gas compressor is a technique of dewatering gas production by small pressor to pressurized dry gas of tube, then inject dry gas into oil casing annulus of liquid loading well, by controlling emission to exclude effusion. Based on oil/gas field demand, our company designs the technological principles, parameters and processes of truck-mounted natural gas compressor and manufactured trucked-mounted gas compressor and has applied these in gas well production by dewatering.
 
The process characteristics and advantages

Truck-mounted has the characteristics of flexible, mobile, moving security convenient, fast and high efficient.
The gas for lifting supply from gas in artery, the process of construction is economic and efficient.
The process is simple and practical, no special expropriation venue, ready to carry out construction work and put into operation quickly.
Being strong practical, it can be used for gas lift operation and also for the wellhead booster.


返回列表
pre:
next:

Beijing Jerrywon Energy Equipments Co., Ltd  

TEL:+086-10-84976921 FAX:010-84976930

TimesFirst Holdings Inc.:Jerrywon